A Coal Tar Pitch Impregnation Process requires a new pollution control device to manage off-gasses.
Industrial Energy Engineering conducted an Energy Audit and Analysis. We recommended a production process modification which will reduce the loading on the off-gas control device and allow the implementation of a much less expensive device.
This process modification, when implemented, will save $200,000 per year in operating costs of the new pollution control device.
STRATEGIC VISION
Project 14890
RESULT
PLEASE CLICK THE ARROWS TO THE RIGHT AND LEFTTO VIEW ADDITIONAL PROJECTS
A Chemicals Manufacturer has a high temperature stack gas that could be used to generate steam
Industrial Energy Engineering calculated the energy release from the process and wrote a performance specification for equipment and installation of a waste heat boiler.
The 4.5 million dollar capital cost has a payback of less than 4 years and is in the capital budget.
BETTER EQUIPMENT
Project 29473
RESULT
The 4.5 million dollar capital cost has a payback of less than 4 years and is in the capital budget.