A Coal Tar Pitch Impregnation Process
requires a new pollution control
device to manage off-gasses.

Industrial Energy Engineering conducted an Energy Audit and Analysis.
We recommended a production process modification
which will reduce the loading on the off-gas
control device and allow the implementation
of a much less expensive device.

This process modification,
when implemented,
will save $200,000 per year
in operating costs of the
new pollution control device.

STRATEGIC VISION
Project 14890

RESULT

PLEASE CLICK THE ARROWS TO THE RIGHT AND LEFTTO VIEW ADDITIONAL PROJECTS
Slide background

A Chemicals Manufacturer has a high
temperature stack gas that could be
used to generate steam

Industrial Energy Engineering calculated the energy
release from the process and wrote a performance
specification for equipment and installation of
a waste heat boiler.

The 4.5 million dollar capital cost has a
payback of less than 4 years and is in
the capital budget.

BETTER EQUIPMENT
Project 29473

RESULT

Arrow501
Arrow502

The 4.5 million dollar capital cost has a payback of less than 4 years and is in the capital budget. 